The following table lists all costs of quality incurred by Sam’s Surf Shop last year.

 Click here for tutorial
 
MGT655 Week 7 chapter 12 and 13 tutorial in excel
Chapter 12
7. The following table lists all costs of quality incurred by Sam’s Surf Shop last year. What was Sam’s appraisal cost for quality last year?
Annual inspection costs $ 155,000
Annual cost of scrap materials 286,000
Annual rework cost 34,679
Annual cost of quality training 456,000
Annual warranty cost 1,546,000
Annual testing cost 543,000
 
10. A manufacturing company has been inspecting units of output from a process. Each product inspected is evaluated on five criteria. If the unit does not meet standards for the criteria it counts as a defect for the unit. Each unit could have as few as zero defects, and as many as five. After inspecting 2,000 units, they discovered 33 defects. What is the DPMO measure for this process?
 
Chapter 13, Objective Questions:
6. C-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 4 6 .003 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 4.001 inches with a standard deviation of .002 inch.
a. Calculate the Cpk for this machine.
b. Should C-Spec use this machine to produce this part? Why?
 
7. Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart for control. The samples and the number of defectives in each are shown in the following
table:
Sample n
Number of
Defective Items
in the Sample Sample n
Number of
Defective Items
in the Sample
1
2
3
4
5
15
15
15
15
15
3
1
0
0
0
6
7
8
9
10
15
15
15
15
15
2
0
3
1
0
a. Develop a p-chart for 95 percent confi dence (1.96 standard deviation).
b. Based on the plotted data points, what comments can you make?
 
8. A shirt manufacturer buys cloth by the 100-yard roll from a supplier. For setting up a control chart to manage the irregularities (e.g., loose threads and tears), the following data were collected from a sample provided by the supplier.
Sample 1 2 3 4 5 6 7 8 9 1 0
Irregularities 3 5 2 6 5 4 6 3 4 5
a. Using these data, set up a c-chart with z 5 2.
b. Suppose the next fi ve rolls from the supplier had three, two, fi ve, three, and seven irregularities. Is the supplier process under control?
 
9. Resistors for electronic circuits are manufactured on a high-speed automated machine. The machine is set up to produce a large run of resistors of 1,000 ohms each. To set up the machine and to create a control chart to be used throughout the run, 15 samples were taken with four resistors in each sample. The complete list of samples and their measured values are as follows:
Sample Number Readings (in ohms)
1
2
3
4
5
6
7
8
9
10
1010
995
990
1015
1013
994
989
1001
1006
992
991
996
1003
1020
1019
1001
992
986
989
1007
985
1009
1015
1009
1005
994
982
996
1005
1006
986
994
1008
998
993
1005
1020
996
1007
979
11
12
13
14
15
996
1019
981
999
1013
1006
996
991
993
1002
997
991
989
988
1005
989
1011
1003
984
992
 
Click here for tutorial

No comments:

Post a Comment